HII Logo

August 15, 2013

FINAL AIRCRAFT ELEVATOR INSTALLED ON GERALD R. FORD (CVN 78)

NewsNews ReleaseNewport News Shipbuilding
Share:
FINAL AIRCRAFT ELEVATOR INSTALLED ON GERALD R. FORD (CVN 78)

NEWPORT NEWS, Va., Aug. 15, 2013 (GLOBE NEWSWIRE) -- Huntington Ingalls Industries (NYSE:HII) announced today that its Newport News Shipbuilding (NNS) division installed the third and final aircraft elevator on the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78).

The elevator, which is used to move aircraft from the hangar bay to the flight deck quickly and safely, is located on the starboard side of the ship. It measures 85 feet long and 52 feet wide and weighs 120 tons, akin to a steam locomotive.

"The Ford class is designed with three aircraft elevators, one less than the Nimitz class," said Rolf Bartschi, NNS vice president, CVN 78 carrier construction. "The design provides greater flight deck area for increased sortie rates over the Nimitz-class design. The location and number of aircraft elevators are an integral part of the design."

Gerald R. Ford's primary hull structure reached 100 percent structural completion in May, bringing more than three years of structural erection work to a close. Work continues on the ship, including work on the piping and electrical systems and habitability areas such as the galley and mess spaces. Shipbuilders are also in the process of painting the hull prior to the ship's christening, scheduled for Nov. 9.

About HII

HII is America's Seapower Company. The nation’s largest shipbuilder, HII builds the manned and unmanned maritime systems and all-domain mission technologies that project U.S. and allied power around the world. With a more than 140-year history of advancing U.S. national security, HII is headquartered in Virginia and employs 46,000 people across three divisions.

Related News

November 10, 2026

HII and Navy Break Ground on New Customer Support Complex at Ingalls Shipbuilding

November 3, 2026

HII Successfully Completes Builder’s Trials on Harrisburg (LPD 30)

November 3, 2026

HII and Thales Successfully Demonstrate Expeditionary PathMaster's Ability to Deliver an End-to-End Autonomous Mine Countermeasure Mission

Sign Up for Updates

Enter your email to receive news updates and insights.

By subscribing you agree to our Privacy Policy and provide consent to receive updates from HII.